This project was located in Minnesota. He used #3 GatorBar on 18 in centers and the 1 1/2 inch rebar chairs by Polylok.
This project was located in Minnesota. He used #3 GatorBar on 18 in centers and the 1 1/2 inch rebar chairs by Polylok.
Bring on the GatorBar!
#3 Gatorbar is tied up and ready for the pour!
Pour in progress. Metal screeds were used to level the concrete.
A rebar tying gun was used to secure each intersection. The #3 GatorBar was placed on top of 1 1/2 inch chairs for the best results.
Halfway done!
Concrete apron is finished!