Project Details
Product: #5 GatorBar: 5-foot lengths used as dowels at construction joints, and #3 GatorBar: Installed in a 6' × 6' grids with 12-inch on center spacing around hillside anchors.
Owner: Copper Peak
Concrete Contractor: Engineering & Construction Innovations, Inc.
General Contractor: Barr Engineering Co.
Location: Ironwood, Michigan
Photos provided by Barr Engineering Co., Engineering & Construction Innovations, Inc., and Copper Peak.
Case Study: Copper Peak – Hillside Stabilization
Project Overview:
Copper Peak, home to the world's largest ski jumping hill, presented a unique hillside stabilization challenge. With slopes exceeding 40 degrees, handling and installing traditional steel reinforcement would be difficult and labor-intensive. GatorBar's lightweight properties offered an alternative that helped simplify reinforcement handling and improve jobsite safety.
GatorBar Application:
Construction Joint Reinforcement: #5 GatorBar was used as dowels at the construction joints.
Hillside Reinforcement: #3 GatorBar was installed in a grid around the hillside anchors to help transfer forces from the concrete slab into the slope.
Shotcrete Installation: A specialized shotcrete mix was sprayed directly over the surface and GatorBar grid. Inspections reported no deterioration of the GatorBar following application. The concrete was then screeded in approximately 12-foot sections, extending to the top of the hill crest.
Project Results:
The reinforced landing area spans 1,111 feet along the hillside, with slopes exceeding 40 degrees. GatorBar helped reduce the need for heavy steel reinforcement on the steep slope, improving material handling and contributing to a safer installation process.
This project demonstrates how GFRP reinforcement can be used in challenging infrastructure applications where weight, handling, and installation conditions are important considerations.